About Project
Kilbury Group were contracted by 2Construct to take on the concrete package for the new Art, Design and Technology Wing of Yarra Valley Grammar. The footprint of the job was approximately 1,100m2 with a raft slab and two suspended slabs. All columns on the job were in-situ with circular columns that were poured at 45 degrees on both levels. There were also 2 levels of in-situ stairs.